SteelHaven Homes
Building nowHighland, IL

The Duo #2 – 115 Auburn Ct

Currently Building — Open for Pre-Completion Reservation

A freshly poured concrete slab foundation with plumbing pipes and electrical conduits protruding from the surface.
Latest jobsite photo, 2026-09-30: Insulated Concrete Slab

Build progress

Insulated Slab Complete — Moving to CFS Steel Framing

3 of 5 build stages complete60%
  1. 01. Site & UtilitiesComplete
  2. 02. Insulated FoundationComplete
  3. 03. Insulated Slab PourComplete
  4. 04. CFS Steel Framing & RoofIn progress
  5. 05. Envelope & Interior FinishesUpcoming

GET UPDATES ON THIS HOME

Follow The Duo #2 as it's built

Leave your email and we'll send you progress photos as each stage is finished, plus first notice when walkthroughs and reservations open.

No spam, and no mailing list you didn't ask for. Reply to any update to stop.

About this home

Following the 100% sellout of our inaugural Duo at Field Crossing, The Duo #2 at 115 Auburn Ct in Highland, Illinois is actively underway and open for pre-completion reservation. Walk the jobsite during framing, inspect the PermaHaven™ cold-formed steel and insulated slab engineering firsthand, and lock in your residence before public MLS listing.

  • Reserve Unit A or Unit B Prior to Completion (Pre-MLS Pricing)
  • 3 Bedrooms · 2 Bathrooms · Individual Fee-Simple Ownership
  • PermaHaven™ Cold-Formed Steel Structure + Insulated Concrete Slab
  • Private Hard-Hat Walkthrough Available During Construction

Key facts

Model
The Duo
Location
115 Auburn Ct, Highland, IL
Status
Currently Building — Open for Pre-Completion Reservation
Units
2 Attached Single-Family Villas (Units A & B) — Available to Reserve Now
Home type
Attached Single-Family Villa
Bedrooms
3
Bathrooms
2
Size
1,700 sq. ft. per unit, including 2-car garage
Structure
PermaHaven™ cold-formed steel system

Jobsite photos

Verified field photos (SHH-IL-HIL-005), newest first
A freshly poured concrete slab foundation with plumbing pipes and electrical conduits protruding from the surface.Insulated Concrete Slab2026-09-30
A freshly poured concrete slab foundation with plumbing pipes and electrical conduits protruding from the surface.
The image shows a large, freshly poured concrete slab foundation with wooden forms and rebar protruding from the edges.Insulated Concrete Slab2026-09-16
The image shows a large, freshly poured concrete slab foundation with wooden forms and rebar protruding from the edges.
The image shows a residential construction site with a concrete slab foundation prepared with a rebar grid and plumbing pipes protruding from the surface.Insulated Concrete Slab2026-09-15
The image shows a residential construction site with a concrete slab foundation prepared with a rebar grid and plumbing pipes protruding from the surface.
A construction site showing a prepared concrete slab foundation with a grid of rebar and plastic vapor barrier laid out within wooden forms.Insulated Concrete Slab2026-09-15
A construction site showing a prepared concrete slab foundation with a grid of rebar and plastic vapor barrier laid out within wooden forms.
The photo shows a residential construction site with concrete foundation walls and a prepared slab area surrounded by wooden forms and gravel.Insulated Foundation2026-09-04
The photo shows a residential construction site with concrete foundation walls and a prepared slab area surrounded by wooden forms and gravel.
The photo shows a leveled sand building pad with plumbing and electrical pipes protruding, ready for the foundation.Site & Utilities2026-09-04
The photo shows a leveled sand building pad with plumbing and electrical pipes protruding, ready for the foundation.

PRE-COMPLETION RESERVATION

Reserve The Duo #2 before completion

Ask for pre-completion pricing, completion timing, and a private hard-hat walkthrough while the steel structure is still visible.

Tell us which unit and timeline fit your move, and our team will follow up directly.